|
9 562 brands
2 694 000 user's guides |
|
Download your manual, it's FREE! Diplodocs allows you to download several types of document in order to best use your ARROW HM108-A : user manual, user guide, instruction manual.
|
|
Need help using a product?
|
|
User manual ARROW HM108-A
Preview of the first 3 pages of manual
You either have JavaScript turned off or an old version of Adobe Flash Player Get the latest Flash Player.
Manual abstract: user guide ARROW HM108-A
Detailed instructions for use are in the User's Guide. Owner's Manual & Assembly Instructions
A01
Model No.EN108-A NP108 SA108-A
HM108-A NW108-A VN108-A
MN108-A PD108-A
709291207
BUILDING DIMENSIONS * Size rounded off to the nearest foot
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES WHEN HANDLING METAL PARTS.
*Approx. Size 10' x 8'
Foundation Size 121" x 92 3/4"
Storage Area Sq. Ft. Cu. Ft. 74
6,9m2
Exterior Dimensions (Roof Edge to Roof Edge) Width Depth Height 123 1/4"
313cm
Interior Dimensions Door (Wall to Wall) Opening Width Depth Height Width Height 118 1/4" 90" 69 5/8" 55 1/2"
141cm 147cm
401
11,4m3
95 1/4"
242cm
70 7/8"
180cm
58"
3,0m x 2,3m 307cm x 236cm
300cm
229cm
177cm
BEFORE YOU BEGIN....
A2
Owner's Manual
Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable.
Assembly Instructions:
Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for correct results.
Foundation and Anchoring: Your storage building must be anchored to prevent wind
damage. A foundation is also necessary as a base in order to construct a square and level building. Anchoring and foundation materials are not included with your building. We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct a foundation and anchoring system of your choice. Your assembly instructions provide information on a few methods commonly used to secure and level a storage building.
Parts and Parts List: Check to be sure that you have all the necessary parts for your
building.
·All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the parts list. The parts list is located on page 12. ·If you find that a part is missing, include the model number of your building and contact:
Arrow Group Industries, Inc. Customer Service Department Route 50 East Breese, Illinois 62230 1-800-851-1085
·Separate contents of the carton by the part number while reviewing parts list. The first few steps show how to join related parts to make larger sub assemblies which will be used later. ·Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.
2
PLAN AHEAD....
A3
Watch the Weather: Be sure the day you select to install your building is dry and calm.
Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
Tools and Materials:
These are some basic tools and materials you will need for the construction of your building. Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need.
Required · Eye Goggles · No. 2 Phillips Screwdriver
(With Hardened Magnetic Tip) Note: A power screwdriver or variable speed drill with Phillips-tip attachment can speed assembly by as much as 40%.
Required · Work Gloves · Step Ladder · Utility Knife / Scissors · Pliers · Carpenter's Level · Tape Measure
Optional Time-Savers · Wrench / Nut Driver · Electric / Cordless Drill · Square · String (for squaring frame)
Foundation Preparation · Hammer and Nails · Spade or Shovel · Hand Saw / Power Saw · Lumber and/or Concrete
Before assembly, you will want to decide on a location for your building. The best location is a level area with good drainage.
·Allow enough working space for ease of moving parts into position during assembly. Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside. ·Before you begin the first steps in assembling your parts, a foundation should be constructed and an anchoring system should be ready to use.
3
Selecting and Preparing Your Site:
SAFETY FIRST....
A4
Safety precautions are important to follow throughout the construction of your building. ·Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building.
safety edge sharp edge
·Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
sharp edge
safety edge
·Keep children and pets away from worksite to avoid distractions and any accidents which may occur.
·Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds. Call 1-800-851-1085
·Never concentrate your total weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it.
·Do not attempt to assemble the building on a windy day, because the large panels acting as a "sail", can be whipped about by the wind making construction difficult and unsafe.
4
CARE & MAINTENANCE....
A5 Web
Finish:
For long lasting finish, periodically clean and wax the exterior surface. Touchup scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation.
Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy
amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation.
Doors: Always keep the door tracks clear of dirt and other debris that prevent them from
sliding easily. Lubricate door track annually with furniture polish or silicone spray. Keep doors closed and locked to prevent wind damage.
Fasteners: Use all washers supplied to protect against weather infiltration and to protect
the metal from being scratched by screws. Regularly check your building for loose screws, bolts, nuts, etc. and retighten them as necessary.
Moisture:
A plastic sheet (vapor barrier) placed under the entire floor area with good ventilation will reduce condensation.
Other Tips....
· Wash off inked part numbers on coated panels with soap and water. · Silicone caulking may be used for watertight seals throughout the building.
Do not store swimming pool chemicals in your building. Combustibles and corrosives must be stored in air tight approved containers. Keep this Owner's Manual and Assembly Instructions for future reference.
5
ACCESSORIES....
A6 WEB
ROOF STRENGTHENING (heavy snow load) KITS
Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%.
FLOOR FRAME KITS
ANCHOR KITS
Model No. AK4
Anchor Kit contains heavy-duty steel augers, 60' (18m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings larger than 10'x9', use 2 kits. MODELS FB47410, FB5465, FB106-A FB109-A and FB1014-A A simple new floor frame system made of heavy-duty, hot-dipped galvanized steel. Use as foundation for plywood, sand or stone.
ATTIC KIT / WORKBENCH KIT
Heavy-duty galvanized steel bars that fit all 10' wide Arrow buildings. They install quickly and easily to help organize space and create more useable space as an attic or workbench. Will hold up to 250 lbs. (113kg) evenly distributed. Model No. AT101 Fits Shipping Weight 16 lbs. (7kg)
Model No. AK100
New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab. Each kit contains heavy-duty, hot-dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab. Full assembly instructions and a 1/4" masonary drill bit are included.
10' Long, 250 lb. (113kg) load+ Fits all Arrow 10' wide buildings.
Model No. AK600
Earth Anchor Kit anchors any size Arrow building to the ground. Each kit contains heavy duty, hot-dipped galvanized steel corner gussets and 4 earth anchors.
Must be drilled for use as workbench in Estator. + Even weight distribution.
SHELF UNITS
Heavy-duty, galvanized steel shelf units help organize storage space. They easily mount on the wall or sit on the floor. Fits all Arrow buildings.*
TOOL HANGING RACK
Model No. TH100
The perfect tool organizer. Twin 25 1/2" (65cm) steel channels plus five heavy-duty snap-in hangers and a small tool holder for screwdrivers, pliers, etc. Holders slide along channel for fully adjustable spacing. Great for garage, basement, or the back of any door. Fits all Arrow storage buildings.
Model No. SS404 · Makes 8" to 12" (20-30cm) wide shelves in any length. · Brackets, braces, hardware included. Lumber is not included.
Model No. SS900-A · Grey color · 3 shelves · Holds up to 85 lbs. (38kg) (even weight distribution)
* Some drilling required to fit buildings without mid-wall bracing.
6
THIS PAGE WAS LEFT BLANK INTENTIONALLY
7
THIS PAGE WAS LEFT BLANK INTENTIONALLY
8
Foundation
A09
The Foundation For Your Building
OPTION 1: ARROW FLOOR FRAME KIT:
(Order No. FB109-A or 68385-A)
Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground. Allow 1 - 2 hours for construction.
OPTION 2: Wood Platform
If you decide to build your own foundation, be sure to select the appropriate materials. These are the recommended materials for your foundation: 2 x 4's (5cm x 10cm) Pressure Treated Lumber 5/8" (1,5cm) 4 x 8 (122cm x 244cm) Plywood-exterior grade 10 & 4 penny Galvanized Nails Concrete Blocks (optional) The platform should be level and flat (free of bumps, ridges etc.) to provide good support for the building. The necessary materials may be obtained from your local lumber yard. To construct the foundation follow instructions and diagram. Construct frame (using 10 penny galvanized nails) Measure 16"/24" (40,6cm/61cm) sections to construct inside frame (see diagram) Secure plywood to frame (using 4 penny galvanized nails) Allow 6 - 7 hours for construction.
1 40, 6"/24 6cm " /61 cm
FRONT 121" 3 (DOOR) ,1m
/4" 23 m 94 2,
OPTION 3: Concrete Slab
Note: Platform/Slab will extend 9/16" (1,4cm) beyond floor frame on all four sides. Seal this 9/16" of wood with a roofing cement (not included), or bevel this 9/16" of concrete when pouring, for good water drainage.
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame. The following are the recommended materials for your foundation. 1 x 4's (2,5cm x 10cm) (will be removed once the concrete cures) Concrete Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of: 1 part cement 3 parts pea sized gravel 2 1/2 parts clean sand Prepare the Site/Construct a Foundation 1. Dig a square, 6" (15cm) deep into the ground (remove grass). 2. Fill up to 4" (10cm) in the square with gravel and tamp firm. 3. Cover gravel with a sheet of 6 mil plastic. 4. Construct a wood frame using four planks of 1x4 (2,5cm x 10cm) lumber. 5. Pour in concrete to fill in the hole and the frame giving a total of 4" (8-10cm) thick concrete. Be sure surface is level.
12 FRONT 3, 1" 1m (DOOR)
" 3/4 92 4m 2,
Note: Finished Slab dimensions, with lumber removed. Allow 3 - 5 hours for construction and a week for concrete curing time. 9
Anchoring
A10
Anchoring Down The Building
It is important that the entire floor frame be anchored after the building is erected.
Below are recommended ways of anchoring.
Arrow Anchoring Kit: (Model No. AK4 or 60298) Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction.
Anchoring into Wood/Post:
Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. holes provided in the frames for proper anchoring.
1.
2.
OVER THE BEAMS AND INTO THE GROUND
Arrow ... |
|||||||
| Know our Partners | Frequently Asked Questions | Contact Diplodocs team | Last searches Latest additions |
Sitemap | ![]() |
||||||||
| Brands starting with A B C D E F G H I J K L M N O P Q R S T U V W X Y Z # | |||||||||||||
|
|
Copyright © 2005 - 2008 - Diplodocs -
All Rights Reserved. Designated trademarks and brands are the property of their respective owners. |