Instructions For Assembly
solid rail
Step 1
Locate the two split rails and the solid rail that is the same length as the split rails. Insert two corner brackets into each end of the solid side Ano rail. Insert one corner bracket into each end of each split side Ano rail. Fig. 2 Note: Tension tabs on corner brackets face towards outside of frame. Fig. 1
Figure 1
Figure 2
split rails
Step 2
For ceiling application, slide screw tabs into channel of top Ano rail. For wall applications, slide into side Ano rail. Fig. 3.
Step 3
Place one transitional collar over each screw tab and push onto frame. Fig. 4.
Figure 3
Figure 4
solid rail
Step 4
Finish assembling frame following the sequence in Fig. 5. Note: Placement of split rails will depend on type of frame. Split rails will be on the top for top-loading frames and on the side for sideloading frames.
solid rail
split rails
Figure 5
The AnoFrame VersaMount is a trademark of Rose Displays, Ltd. Neither the manufacturer nor any sales agent may be held liable for injury, loss or damage resulting from the use of these products. Part #02INSVersaMountScrewBaseSQ
Incept-9.06.02
35 Congress Street, Salem MA 01970 Tel# 1-800-631-9707 Fax# 1-800-560-2890 e-mail:signware@rosedisplays.com
AnoFrame VersaMountTM Screw Base
#97-0451SQ
Parts
Instructions For Assembly
Step 5
Screw posts onto screw tabs and tighten. Fig. 6 Note: Use the end of the post with the smaller opening.
Instruction Sheet (page 2 of 2)
Step 6
Insert one screw into the middle opening on each screw base and into the post. Fig 7 Tighten with screwdriver. Fig. 8
Figure 6
Figure 7
Step 7
Install screw bases using wood screws and screwdriver. Fig. 9 Note: Togglebolts are recommended for drywall installations (predrilling 3/8" holes is necessary)
Figure 8
Figure 9
Step 8
Slide your graphic into the AnoFrame. Fig. 10
Figure 10
Finished Look
The AnoFrame VersaMount is a trademark of Rose Displays, Ltd. Neither the manufacturer nor any sales agent may be held liable for injury, loss or damage resulting from the use of these products. Part #02INSVersaMountScrewBaseSQ
35 Congress Street, Salem, MA 01970 Tel# 1- 800 631-9707 Fax# 1-800-560-2890 e-mail:signware@rosedisplays.com
Incept-9.06.02
AnoFrame VersaMountTM Screw Base
#97-0451SQ
Parts
Instruction Sheet (page 1 of 2)
Screw Tabs
Screw Bases Wood Screws or Togglebolts
AnoFrame Rails
AnoFrame Split Rails
Corner Brackets
Transitional Collars
Posts
Screws
Instructions For Assembly
solid rail
Step 1
Locate the two split rails and the solid rail that is the same length as the split rails. Insert two corner brackets into each end of the solid side Ano rail. Insert one corner bracket into each end of each split side Ano rail. Fig. 2 Note: Tension tabs on corner brackets face towards outside of frame. Fig. 1
Figure 1
Figure 2
split rails
Step 2
For ceiling application, slide screw tabs into channel of top Ano rail. For wall applications, slide into side Ano rail. Fig. 3.
Step 3
Place one transitional collar over each screw tab and push onto frame. Fig. 4.
Figure 3
Figure 4
solid rail
Step 4
Finish assembling frame following the sequence in Fig. 5. Note: Placement of split rails will depend on type of frame. Split rails will be on the top for top-loading frames and on the side for sideloading frames.
solid rail
split rails
Figure 5
The AnoFrame VersaMount is a trademark of Rose Displays, Ltd. Neither the manufacturer nor any sales agent may be held liable for injury, loss or damage resulting from the use of these products. Part #02INSVersaMountScrewBaseSQ
Incept-9.06.02
AnoFrame VersaMountTM Screw Base
#97-0451SQ
Parts
Instructions For Assembly
Step 5
Screw posts onto screw tabs and tighten. Fig. 6 Note: Use the end of the post with the smaller opening.
Instruction Sheet (page 2 of 2)
Step 6
Insert one screw into the middle opening on each screw base and into the post. Fig 7 Tighten with screwdriver. Fig. 8
Figure 6
Figure 7
Step 7
Install screw bases using wood screws and screwdriver. Fig. 9 Note: Togglebolts are recommended for drywall installations (predrilling 3/8" holes is necessary)
Figure 8
Figure 9
Step 8
Slide your graphic into the AnoFrame. Fig. 10
Figure 10
Finished Look