|
9 562 brands
2 694 000 user's guides |
|
Download your manual, it's FREE! Diplodocs allows you to download several types of document in order to best use your SKYPE EP6 : user manual, user guide, instruction manual.
|
|
Need help using a product?
|
|
User manual SKYPE EP6
Preview of the first 3 pages of manual
You either have JavaScript turned off or an old version of Adobe Flash Player Get the latest Flash Player.
Manual abstract: user guide SKYPE EP6
Detailed instructions for use are in the User's Guide. SKYE
________________________________________________________
AC SERVICE EQUIPMENT
________________________________________________________
OWNERS MANUAL
SuperSKYE
MODEL EP6
R12/R134a A/C SERVICE CENTER
WARNING -- DO NOT MIX REFRIGERANTS
January 1, 2001
EP6manb
2
SKYE International Holdings, Inc., 7441 Tower Street, Fort Worth TX. 76118
FOR TECHNICAL SUPPORT AND CUSTOMER SERVICE PLEASE CALL 1-800 722 SKYE (7593)
RECORD YOUR EQUIPMENT DETAILS BELOW: MODEL NO. ............................................ SERIAL NO. ............................................ DATE PURCHASED. ............................................ PURCHASED FROM. ............................................
Thank you for choosing SKYE. With proper set up and maintenance your equipment will provide years of trouble free service. To activate your warranty, fill out and mail in the enclosed card and the EPA certification form today. Thanks Again.
TABLE OF CONTENTS
2
3
Ownership Information ------------------------------------- 2 Important Information, Warnings & Cautions -------- 4 Know Your Machine (Illustrations) ---------------------- 5, 6 Set Up Procedure ------------------------------------------- 7, 8 Tank Precharge / Recharge Procedure --------------- 8 Display Procedure ------------------------------------------- 9 Automatic Routine Procedure --------------------------- 10, 11 Recovery Procedure --------------------------------------- 12, 13 Vacuum Procedure (Includes Oil Charge) ----------- 13, 14 Charging Procedures -------------------------------------- 14 - 16 Non-Condensable Gas Venting ------------------------- 16, 17 Recovered Oil Drain Procedure ------------------------- 17 Change Gas (Refrigerant) Procedure ----------------- 18, 19 Filter Change Procedure ---------------------------------- 19, 20 Flush Procedure --------------------------------------------- 20 - 22 Help Procedure ---------------------------------------------- 22, 23 Display Mode Procedure ---------------------------------- 23, 24 Tank Size Selection Procedure ------------------------- 24 System Stats ------------------------------------------------- 24, 25 Update Procedure ------------------------------------------ 25 Additional Features ---------------------------------------- 25, 26 Equipment Service & Maintenance -------------------- 26 Troubleshooting Tips -------------------------------------- 27 Pressure Temperature Chart ---------------------------- 28 Warranty ------------------------------------------------------ 29
WARNING:
3
4 1. THIS EQUIPMENT OPERATES AT HIGH PRESSURES AND AT HIGH VOLTAGES AND IF IMPROPERLY USED MAY CAUSE PERSONAL INJURY. 2. MUST BE OPERATED BY QUALIFIED PERSONNEL. 3. READ INSTRUCTIONS CAREFULLY BEFORE OPERATING OR SERVICING. 4. TO PREVENT PERSONAL INJURY FROM REFRIGERANTS OPERATORS MUST WEAR SAFETY GLASSES, GLOVES AND PROTECTIVE CLOTHING. 5. DO NOT OPERATE EQUIPMENT IF DAMAGED.
IMPORTANT:
· · · · · · · · Close the tank liquid valve after each charge operation. Change filter after every 10 hours of recovery operation. Use SKYE # 256100 only. Check the vacuum pump oil regularly. Change the vacuum pump oil monthly. Fill with 8 ounces. Use SKYE # 276030. Close all tank valves when the machine is not in use. Always replace caps on ports not in use. Check your fittings and hoses for leaks regularly. If machine does not turn on, check fuse(s). (SKYE #246435 for 120VAC or SKYE # 246445 for 240VAC)
CAUTION:
This machine is computer controlled. DO NOT turn power off while performing a function unless absolutely necessary. If power is turned off, allow at least 10 seconds before turning on again. DO NOT place magnetic tools on the control panel surfaces. This may cause damage to the computer components and program.
WARNING: Improper operation will void your warranty.
NEW STORAGE TANKS MUST BE EVACUATED before use to remove any air and moisture.
REFRIGERANTS
The SUPERSKYE EP6 AC Service Center is designed for use with R12 and R134a.
IMPORTANT: PREVENT ACCIDENTAL REFRIGERANT LOSS
" REFRIGERATION LOSSES OCCUR THROUGH LOOSE CONNECTIONS AND SCHRADER VALVES. CHECK YOUR FITTINGS AND VALVES. " ALWAYS CHECK THAT THE O-RINGS IN THE VALVE CAPS ARE IN GOOD CONDITION AND ENSURE CAPS ARE TIGHT. " LEAK TEST FITTINGS & HOSE CONNECTIONS PERIODICALLY USING AN ELECTRONIC LEAK DETECTOR OR SOAPY WATER. " CLOSE STORAGE TANK VALVES WHEN YOUR MACHINE IS NOT IN USE. " WARNING: ELECTRICAL FAULTS MUST BE REPAIRED BY A QUALIFIED ELECTRICIAN.
KNOW YOUR UNIT
4
5 Your SUPERSKYE EP6 is designed for vapor and/or liquid refrigerant RECOVERY/ RECYCLING, VACUUM and RECHARGE of systems containing R12 or R134a. DO NOT LAY THE UNIT DOWN -- THIS WILL CAUSE LOSS OF VACUUM PUMP OIL. The EP6 unit comes with: 1 x 96" R12 Red service hose with ABB on one end. 1 x 96" R12 Blue service hose with ABB on one end. 1 x 96" R134a Red service hose with Service Adapter on one end. 1 x 96" R134a Blue service hose with Service Adapter on one end. 2 x 30 lb. (14.6 Kg) Dual valve storage tanks with floats. (1 x R12, 1 x R134a) 2 x 8 oz. (240 cc) Oil measuring bottles. (1 x oil drain, 1 x oil charge) 2 x 32" R12 tank hoses with ABB on both ends. 2 x 32" R134a tank hoses with ABB on both ends. 1 x Temperature probe with 10' lead. 1 x Set of clutch voltage probes with 48" leads. (1 x Red, 1 x Black) 1 x 8 oz. (240 cc) Bottle of Vacuum Pump Oil.
EP6 CONTROL MENU LAYOUT
REFRIGERANT SELECTED MAIN MENU DISPLAY AUTO
SKYE
RECOVER VACUUM MENU 2
BUTTON BAR
REFRIGERANT SELECTED MENU 2
SKYE
NCG CHECK
RECOVERED OIL DRAIN
CHARGE
CHANGE GAS
MENU 3
BUTTON BAR
REFRIGERANT SELECTED MENU 3 CHANGE FILTER SET UP
SKYE
FLUSH HELP MENU 4
BUTTON BAR
REFRIGERANT SELECTED
MENU 4
SKYE
5
6
DISPLAY MODE
TANK SIZE
SYSTEM STATS
UPDATE
MAIN MENU
BUTTON BAR
HOSE CONNECTION LAYOUT
LOW SIDE HIGH SIDE TANK LIQUID TANK VAPOR MOISTURE INDICATOR
#
R134a
#
R134a
#
R134a
#
R134a
#
#
R12
#
R12
#
R12
#
R12
NOTE: PORTS MAY BE REVERSED TOP TO BOTTOM
WORKING DISPLAY
Tank Wgt ___ lbs _____ oz
FUNCTION
% Full
______
LO PRESS
______
HI PRESS
_______
SYS PRESS
___
Clutch VDC
____ ____ Duct ____ Amb ____ Sys
TIME EXIT
Set Up Procedure
6
7 BEFORE OPERATING YOUR SUPERSKYE MACHINE FOR THE FIRST TIME READ THE INSTRUCTION MANUAL THEN COMPLETE THE FOLLOWING PROCEDURES. Your new EP6 must be prepared for use prior to any operation with refrigerant. Follow the steps in the SET UP selection from MENU 3. This procedure can be used once at the time of initial set up. It will be deactivated at completion of set up. THE DEFAULT REFRIGERANT FOR SET UP IS R134a. 1. Fill the vacuum pump reservoir with 4 ounces of the oil provided by unscrewing the vent cap/dipstick assembly and pouring it into the fill tube. Add an additional 4 ounces after the motor starts in step 6 then replace the cap/dipstick assembly. 2. Determine which refrigerant you are going to use for the initial set up of the machine then select the appropriate storage tank. Connect the appropriate short hoses to the tank and machine (vapor to vapor/liquid to liquid), place the tank on the scale platform, open both tank valves then connect the tank float lead. 3. Connect the machine to power and turn the master power switch ON. Select MENU 4 then press the TANK SIZE button and select the tank size you are using (default is 30 lb.). Return to MENU 4 and press the DISPLAY MODE button. The next screen allows you to select your preferred weight (lbs & oz or Kg), pressure (PSI, KPa or mBAR) and temperature (Fahrenheit or Celsius) measurements to be displayed. Press the desired button for each option, select your desired measurement method then press the EXIT button to return to the main option screen. Repeat as necessary to select your preferred methods (default is lbs/oz, PSI and Fahrenheit). Once the measurement selection is completed, press EXIT to return to the main menu. Press the MENU button to return to MENU 3 and press the SET UP button. a. If you are setting up for R134a, connect the tank hoses to the corresponding machine and tank ports ( VAPOR to VAPOR/LIQUID to LIQUID ) and open both tank valves. b. If you are setting up for R12, PRESS and HOLD the CHANGE GATE button and move the access gate manually then connect the tank hoses to the corresponding machine and tank ports ( VAPOR to VAPOR/LIQUID to LIQUID ) and open both tank valves. DEFAULT SET UP IS R134a PRESS AND HOLD CHANGE GATE BUTTON TO MOVE GATE
DISPLAY MODE CHANGE GATE CONTINUE EXIT
4. Press the CONTINUE button then press the R12 or R134a button on the following screen to confirm the refrigerant selected. You have the option to move the gate again at this time.
CONFIRM GATE POSITION FOR REFRIGERANT SELECTED 7
8
CHANGE GATE
R134a
R12
5. When the button for the desired refrigerant is pushed, the next screen will be displayed. CONNECT TANK OPEN TANK VALVES REFRIGERANT ________
CONTINUE EXIT
6. Press the CONTINUE button to initiate the automatic preparation sequence. DO NOT interrupt this sequence. The service hoses may be connected to the machine while this operation is in process. 7. When the set up cycle is completed, the machine will stop and display the MAIN MENU. The set up function is now inoperative and cannot be used again. Your storage tank must be precharged now.
PRECHARGE / RECHARGE STORAGE TANK
IMPORTANT: Be sure that new tanks are in a vacuum before charging. 1. To precharge / recharge the tank with R134a, close the tank liquid valve and remove the short liquid hose from the tank and machine. Connect the R134a liquid hose to the low side service hose port on the machine and a virgin R134a bottle, open the valve on the virgin bottle, turn it upside down and set it in front of the machine. To precharge / recharge the tank with R12, close the liquid valve on the storage tank and leave the hose connected to the tank and machine. Connect the R12 low side service hose to the virgin R12 bottle, open the valve on the virgin bottle, turn it upside down and set it in front of the machine. 2. Press the RECOVER button and allow the machine to recover at least 7 lbs. of refrigerant into the storage tank. When the desired amount of refrigerant is precharged, close the valve on the virgin bottle and allow the machine to shut off automatically. 3. When done precharging / recharging with R134a, return the short liquid hose to the tank liquid and machine liquid ports and reinstall the low side service hose.
YOUR EP6 IS NOW READY FOR USE
8
9
DISPLAY PROCEDURE
When DISPLAY is selected the screen will change to the working display. This should be the first screen used when the machine is connected to an AC system to allow the technician to determine the A/C system's condition. This screen allows AC system checks and trouble shooting with the greater ability to locate and diagnose problems than allowed by normal gauge set methods.
Tank Wgt _____
lbs
_____
oz
Function
% Full
_____
LO PRESS ____ Duct
_____
HI PRESS ____ Amb
_____
SYS PRESS _____ Sys TIME
___
Clutch VDC ____ EXIT
TANK WEIGHT: Displays the gross weight of the tank. Empty tank weights: 16 lbs for 30 lb. capacity / 25 lbs for 50 lb. capacity. Note: This reading will display weight fluctuations when the motor is running. This will not affect the critical measurements. FUNCTION: Displays RECOVER when recovering and VACUUM when vacuuming. % FULL: Displays the storage tank % full based on empty weight plus refrigerant. LO: Displays the low side pressure of the AC system. HI: Displays the high side pressure of the AC system. SYS: Displays the internal machine pressure. CLUTCH: Displays the clutch voltage in DC volts. TIME: Displays timer in timed functions DUCT: Displays the temperature reading at the AC system duct when in use. SYS: Displays the temperature of the refrigerant in the machine and tank. AMB: Displays the temperature of air around the machine. EXIT: Return to the main menu or previous screen.
AUTOMATIC ROUTINE PROCEDURE
9
10 NOTE: Before selecting automatic operation check the AC system for pressure and performance using the DISPLAY function. This will allow you to select the appropriate routine for the job being done.
IMPORTANT: Before running the automatic routine, the vehicle AC system must
be off. Connect both service hoses to vehicle. Open tank vapor valve and tank liquid valve. When AUTO is selected, the machine will perform the recovery, vacuum and charge functions automatically. An additional feature of the AUTO routine is the ability to perform the vacuum and charge functions even though a recovery function was not performed. Once the vacuum and charge information is entered and the recovery operation is activated, operator attendance or interference is not required unless an operation error or some other problem is identified and the alarm is activated. The machine checks for pressure in the AC system at the start of the routine and will start the recovery process or automatically advance to the vacuum and charge routine ... |
|||||||
| Know our Partners | Frequently Asked Questions | Contact Diplodocs team | Last searches Latest additions |
Sitemap | ![]() |
||||||||
| Brands starting with A B C D E F G H I J K L M N O P Q R S T U V W X Y Z # | |||||||||||||
|
|
Copyright © 2005 - 2008 - Diplodocs -
All Rights Reserved. Designated trademarks and brands are the property of their respective owners. |