|
9 562 brands
2 694 000 user's guides |
|
Download your manual, it's FREE! Diplodocs allows you to download several types of document in order to best use your SPYKER 64 : user manual, user guide, instruction manual.
|
|
Need help using a product?
|
|
User manual SPYKER 64
Preview of the first 3 pages of manual
You either have JavaScript turned off or an old version of Adobe Flash Player Get the latest Flash Player.
Manual abstract: user guide SPYKER 64
Detailed instructions for use are in the User's Guide. 179 SERIES
FEATURES & BENEFITS
"ACCUWAY'' Spread Pattern Equalizer ENSURES spreading dead center of the spreader. (Indicated with "22" in model number)
spread with confidence
Spreading Chart Operation Guide Service Manual Parts List
20 SERIES
Gears are unconditionally guaranteed ENSURES trouble free operation.
Dial-A-Matic spread rate control ENSURES spreading at exact spread rates.
90 SERIES
Optional BORDER PATROL spread pattern cut-off prevents spreading on drive-ways, flower beds, etc.
70 SERIES
Extension hoppers available for all round hopper spreaders. Adds 20 lbs. to capacity.
Shipped Set-Up. Saves time and labor ENSURES proper assembly. (except #64)
For Models: 30, 34, 54, 64
MODEL 298
Mulch Spreader
Stainless steel frames ensure longer spreader life, easier maintenance and present a quality image.
Model 64 pictured
MODEL 299
Mulch Spreader
High grade plastic non-corroding wheels with nylon bearings, no lubrication required, ENSURES trouble free maintenance.
It's the spread that counts
P.O. Box 7 140 Mill Street Urbana, IN 46990 USA 1-800-972-6130 Fax: 260-774-3416
P.O. Box 7
·
140 Mill Street
·
Urbana, IN
46990
USA
1-800-972-6130
·
Fax 260-774-3416
05-99-0064
© 2005 Spyker Spreaders  Urbana, IN U.S.A.
Assembly Instructions
For Quick and Easy Assembly - First Read Entire Procedure Then Follow Carefully The Step by Step Instructions
Did You Know?
For Models 34 and 54 proceed to step number nine.
Tools you will need:
Flat head Screwdriver 7/16" & 3/8" wrenches Hammer
1.
Caution: Tighten nuts only after complete handle assembly has been made. Use caution not to crush the tubing.
Parts you will use:
· · · · · · · · · · · · · · · · · · · · · Hopper assembly Axle/gears/spinner assembly Drive pin for installation in axle to engage drive wheel. Frame (2) support braces (2) wheels (2) axle bearings (2) wheel retainer caps (2) handle grips Rotary agitator - for use - only if required and necessary - do not install initially Top "T" handle section Center handle section Lower ground prop section Rate control wire with lever (4) 1 1/2" long bolts (6) 1 1/4" long bolts (10) 1/4" nuts (1) Felt washer (1) Cable clip (2) 3/8" nuts (2) 1 1/8" nuts
1
2.Posi
tion the axle/spinner assembly (Part #22 for Models 54 & 64) (Part #47 for Model 34 Only) in the frame (26), exactly as shown.
Frame and axle/spinner assembly must be positioned exactly as shown for clockwise rotation.
Drive bolt hole
3.
Slide the axle bushings (23) over the axle and into the frame. Bushing flanges must be on the outside of the frame as shown. Arms on the flanges preferably toward the ground when spreader is assembled.
2
Spreader Assembly
Troubleshooting
4. 5. 6.
After installing axle in frame. Install 1 drive pin (18) into axle for drive wheel.
7. 8.
Model 34 tire shown
Now install hopper to frame. Slide the spinner shaft (12) through the bearing hole in the bottom of the hopper.
Install the wheels. Be sure slotted hub side is next to the frame. (The drive pin will engage the drive wheel.)
Install front center bolt & nuts (2-4) along with the front grab handle (52) (loosely) first. Then install side bolts, and tighten all bolts securely.
*model 34 only
CAUTION -- at this point make certain assembly is correct. Then install wheel retainers (25) by taping firmly with a hammer (Once installed, removal is nearly impossible.)
White Nylon Washer
45
9.
Install the handle grips (33) on handle. For easier installation, grips may be lubricated with water only.
Note: model 54 has a black plastic hopper.
45
45
10.Connect
T-handle to center section using 4 (1) 11/ " bolt and nut.
Note: Center sections is being obsoleted. Your spreader may not contain one.
3
4
Spreader Assembly Read Before Using
Read Before Using
11.
Connect ground prop to center section 4 using (1) 11/ " bolt and nut. The flattened side of the ground prop should be on the opposite side as the T-handle labels.
15. 16.
Check for proper alignment. Tighten ALL nuts and bolts at this time.
12.Now 13.Posi
2 use the 11/ " bolt and install support braces (27) loosely to handle assembly
Attach lever control assembly (34) to the right hand side of T-handle (30) using 8 (2) 3/8" x (11/ ") bolt and nut.
Tighten securely.
17.Rate
tion the spreader as shown. Join the handle loosely to the crossbar, using the 2 11/ " bolt.
gate adjustment procedure
New Linkage Adjustment Procedure
1. Set regulator dial to 1. 2. Set lever completely to off position. 3. Attach cable clamp to ground prop 4 with 11/ " bolt and nut and finger tighten. 6. Tighten the cable clamp bolt to secure the sheath. 7. Tighten the screw on the swivel to anchor the wire, making sure that the rate gate linkage is pushed up against the dial. 8. Trim excess wire behind swivel connector when finished (if necessary).
14.Secure
the braces (27) loosely to the 2" frame with a 11/ bolt and nut. Braces must be on the inside of the frame.
4. Route cable through clamp, then through swivel and then tighten the cable clamp bolt just enough to allow the cable to slide back and forth easily. 5. Adjust sheath on cable so there is a 1/8" inch of control wire that is visible between the sheath and the edge of the rate gate linkage.
5
6
Rate Dial Adjustment Read Before Using
41
Exploded View
Notes:
1. A Calibrator is also available to do it yourself. 2. The rate gate is closed by pushing the control lever away from you. The rate gate is opened by pulling the control lever toward you. 3. Either wheel can be used as the drive wheel.
Dial Setting Information
The RATE DIAL has 9 numbers with 10 stops between each number, for accurate control of the spreading rate. The dial is set with only a turn. It will automatically lock into the set position. LINE UP THE DIAL NUMBER WITH THE DIAL INDICATOR.
Rate Gate Assembly
30 33 37
* Standard fasteners available at most hardware departments. Parts shipped open account to qualified accounts. All others, cash with order or parts will be shipped C.O.D. at prevailing prices at time of shipment.
51 35-36 8 9 2-4 37 2-4 31 2-4
43
2-4 26 10 6 7 5 3-4 23 4 3-4 27 3-4 3-4 2-4 27 3-4 2-4 7 2-4
Exploded View Read Before Using
55 - Cover (Model 54)
34
2-4 42
3-4 38 2-4 32
23
13
48
52
28
53 - Cover (Models 34 & 64)
46
15 16
21 11
45 for Model 34 Only
49 - for model 34 12 - for models 54 & 64 29 28 16 15 25 14
18 48
21
Extension Hopper
50 24
21 21
20
20 19
Note: direction of curve in agitator wire
47
Model 34 Gear Box
17 for Models 54 & 64
17 15 16
22
Model 54 & 64 Gear Box
8.5" x 3.5" Pneumatic
8" x 2.25" Super Duty
25
18
7
8
Parts List
Item # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 Part # SL-HP-1205 SS-90-0011 SS-90-0012 SS-91-0004 SS-94-0007 05-94-0068 SS-94-0004 05-24-1101 SS-94-0006 05-94-0069 SS-94-0012 SS-97-0004 SS-96-0003 SS-94-0009 SS-90-0001 SS-90-0002 SS-97-0001 SS-90-0010 SS-94-0010 SL-HP-1045 SS-94-0014 SL-HP-1004 SS-94-0011 SS-95-0003 SS-91-0001 SL-HP-1024 SL-HP-1030 SS-92-0002 05-94-0029 05-24-1010 SL-HP-1015 SL-HP-1120 SS-94-0013 05-98-0048 -1 05-91-0008 05-90-0042 05-90-0044 05-24-1105 SS-90-0011 SS-91-0004 SL-HP-1113 05-90-0054 05-99-0064 Quantity 1 6 3 10 1 1 2 1 1 1 1 1 1 1 2 2 1 1 1 1 4 1 2 2 2 1 2 2 1 1 1 1 2 1 2 2 1 1 1 1 1 1 1 Description Hopper Only, 304 Stainless Steel 1/4 - 20 X 1 1/4" Bolt 1/4 - 20 X 1 1/2" Bolt 1/4 - 20 Lock Nut Hopper Bottom Bearings Rate Gate Rate Gate Guide Rate Gate Linkage Dial Only Dial Mount Spinner Spinner Shaft Rotary Agitator Pinion Gear 1/8" x 3/4" Roll Pin/Pinion Gear/Bevel Gear 1/8" x 7/8" Roll Pin/Bevel Gear/Spinner Axle Drive Pin Bevel Gear Gear Box with Bushing (Less Clamp Rings) Clamp Rings Only Spinner Assembly/Axle, Gears, Gear Box, Spinner Bushings for Axle at Frame 8" x 2.25" Super Duty Hard Rubber Wheel Push Cap Nuts for Wheel Retention Painted Frame Support Brace Between Ground Prop & Frame Felt Washer Bushing Only Top "T" Handle Section Center Handle Section Bottom Ground Prop Section Handle Grips On/Off Lever Control On/Off Lever Control Nut On/Off Lever Control Bolt Cable Fastener Cable Clamp Cable Clamp Bolt Cable Clamp Nut Rate Gate Assembly 1/4 - 20 X 1-1/2" Hex Head/Frame/Ground Prop Manual
Spreader Assembly
SPEED - ACCURACY - FREEDOM FROM STRIPES AND STREAKS are yours - when you use this Spreader. The spread width ranges from 4 ft. to 12 ft. wide, depending on the volume/density, particle size of the material and the rate of travel. The spread thins or feathers at the outer edges, eliminating sharp, "Edge of spread" lines which cause stripes and streaks. Extra coverage can be given under trees and other heavy feeding areas without showing "edge of spread" lines. Gaps and double overlaps are less likely. Small errors in travel are forgiven and do not show. WARNING: When spreading products containing herbicides, exercise extreme caution with respect to careless spreading and to wind-drift. CONTACT OF SOME PRODUCTS ON SOME PLANTS CAN BE FATAL. If a dial setting is not found, use the size and weight comparison table found on the back page. Determine a dial setting on the low side. If the setting proves to be too low, cover the area more than one time. A higher setting can be used when a proven dial setting is established. REMEMBER - Published dial settings can be approximate only. The operation of the spreader, the condition of the material (damp or dry or over-pulverized) and weather conditions, are all contributing factors. For these reasons, it's often a good idea to spread the area 2 times - at one-half rate in cross directions (SEE INFORMATION ON ONE-HALF RATE DIAL SETTINGS ON REFERENCE CHART ON THE BACK PAGE. SPREADING AT ONE-HALF RATE DIAL SETTINGS IS HIGHLY RECOMMENDED UNDER DAMP & HUMID CONDITIONS. BECOME FAMILIAR WITH THE OPERATION OF THE SPREADER BEFORE YOU PUT MATERIAL IN THE HOPPER. Practice walking with the spreader, opening and closing the rate gate at the appropriate times. Travel at a constant speed and operate the spreader lever position. Remember: Open the rate gate after the spreader is in motion at operating speed (about 3 mph., or at a brisk walking pace). Close the rate gate while spreader is still at operational speed.
Model 54 Only 43 44 45 05-46-0500 05-94-0065 05-94-0064 1 1 3 Plastic Hopper Cover, Clear Plastic with Black Washer, Plastic
Model 34 Only 46 47 48 49 50 51 Optional 52 53 54 55 05-82-0000 05-99-0021 SL-EH-1005 05-94-0065 Extension Hopper Cover - Model 64 & 34 Screen Cover - Model 54 SS-97-0006 SL-HP-1044 99-50-1081 05-97-0008 SS-95-0004 05-24-1070 1 2 1 1 1 Axle 18 3/4" Long Drilled Axle, Gears, Gear Box, Spinner Assembly Axle, Cotter Pin Spinner Shaft 3/8 x 6 1/2 Pneumatic 8.5 x 3.5 Hand Hold
Rotary Agitator
Use the rotary agitator only if needed. Free-flowing, lump-free materials will not require the agitator. The rotary agitator is easily installed or removed. Note the clockwise rotation & sweep. Place felt washer around spinner shaft before inserting agitator. - See page #8.
OIL BEARINGS AND ALL MOVING PARTS
Make certain the spreader is running freely!
Model 30 Only 56 57 05-54-0004 05-300-0500 1 1 Spinner Shaft Hopper
9
10
Read Before Using
Now You are Ready to Put Material in the Hopper
· · · · Make certain the rate gate is in closed position. As insurance against spill damage and spill loss, put material in the hopper with the spreader on a walk, driveway, paper, plastic, etc. The spreader will be easier to use if you only half-fill the hopper. Later on you can fill the hopper if you so choose. Or for added capacity, the inverted bag in the hopper can serve as a capacity extension. Also, an extension hopper, complete with filtering and pulverizing screen, is available from the manufacturer. CONDITION
Spreader Assembly
Spreader pushes hard: 1 3 4 LOOK FOR . . . . . Dry bushings and corroded shafts. PROCEDURE. . . . Oil these points: 1. Bearing in hopper bottom. 2. Axle bearings. 3. Idle wheel bushing. 4. Bushing in gear box: a. Spinner shaft below gear; b. Hub end bevel gear; c. Hub end of spinner gear; d. Gears; e. Spinner shaft at gear box; f. Axle shaft at gear box. D B E
2
Now You are Ready to Spread
· · Spread header strips at the ends of the area OPPOSITE the direction of spreading. This will provide a "turn-around" area, an area to re-align the spreader for the return spread. Example is for 6 ft. wide spread: Make the first spreading pass at one-half the spread width from the edge of the spreading area or in this case approximately 3 feet or one big step. Additional spreading passes will be at the full spread width or approximately 6 feet apart. TAKE A SIGHTING AT THE FAR END. Keep your eye on the sighting as you spread. You will not need to wonder where you are or where you have been. Continue until spreading is completed. Left over fertilizer can be spread under trees and other high feeding areas without showing "edge of spread" ... |
|||||||
| Know our Partners | Frequently Asked Questions | Contact Diplodocs team | Last searches Latest additions |
Sitemap | ![]() |
||||||||
| Brands starting with A B C D E F G H I J K L M N O P Q R S T U V W X Y Z # | |||||||||||||
|
|
Copyright © 2005 - 2008 - Diplodocs -
All Rights Reserved. Designated trademarks and brands are the property of their respective owners. |